As part of an ongoing process to replace rotten sleepers with block work in the rear car park, car park bays 5 and 8 have just been completed, apart from repainting, which will be undertaken very shortly!
As part of an ongoing process to replace rotten sleepers with block work in the rear car park, car park bays 5 and 8 have just been completed, apart from repainting, which will be undertaken very shortly!
The flags to the main rear entrance have been replaced. The previous flags were in need of replacemet with cracks and an uneven surface, causing a trip hazzard. The area was fully screeded to provide a solid bed (unlike the work carried out originally!).
A complete review on our emergency lighting has been completed by Argos Fire Protection Ltd. Several visits were required to undertake repairs and maintenance, including the replacement of faulty emergency lights, to ensure that all the internal and external balcony lights are working correctly.
The utility doors have been upgraded to comply with the fire regulations. This included fixing an intumescent strip between the double doors plus a larger fire stop on the door frame. Intumescent strips when exposed to extreme heat, expand and close any edges or gaps that may leave the fire door vulnerable to fire and […]
A dry riser system is an empty pipe running up the outside of our building which can be connected to by firefighters and used as a pressurised water system. There is an inlet connection on the outside of the building for the fire services to access, allowing the water to be pumped up to valves […]
The lift cables have had a lubricant applied to help extend their life span. The work was completed by Ideal Lifts Service Ltd.
A new lift servicing contract has been awarded to Ideal Lifts, who originally installed the lift at Great Cliff in 2006. The new service contract will begin on 1 January 2022.
External painting is being carried out to the frontage and east side of the building and is expected to be completed during 2022.
Following waterproofing repairs, the balconies to Flats 14 and 19 have been redecorated.
A small section of driveway, adjacent to a drain cover (on the west side car park entrance) has now been repaired.
All balcony doors have been refurbished and repainted gloss white. New door closers have also been fitted.
A new gardening contract was awarded to Richard Farrer Gardening Services, based on a flexible contract. The business is locally based and already work with Crown Property Management Ltd. They will be working on 8hrs of work for 8 months and 4hrs of work for 4 months.